Critical milestone reached at Project Falcon diamond site
A major milestone has been reached at the massive diamond exploration project at Fort à la Corne east of Prince Albert.
Star Diamond Corporation is confirming the start up of the long-awaited processing of the bulk samples extracted last year at the Star-Orion site by its partner Rio Tinto.
It’s a critical stage of the project that will test the X-ray and sorting technology of the Bulk Sampling Plant (BSP) required to separate the diamonds locked in the kimberlites that were pulled from 10 drill holes by the enormous trench cutter rig.
Those sample holes went as deep as 250 metres and the processing will determine if both the trench cutter technology and the processing plant are working as hoped for in identifying the quantity and quality of diamonds held in the earth’s grasp.